Skip to main content

Universal Design - Accessibility

Here is a home designed for Universal Design in Washington D.C that was sponsored by AARP:
http://www.aia.org/aiarchitect/thisweek08/0627/0627p_aarp.cfm

I know that it is tempting to design homes with doors that are less than 3'-0" or bathrooms that are not wheelchair accessible, but after taking care of my grandmother in my 1970s home, I will make sure that my firm will at least follow fair housing guidelines and at most go with the ANSI 117.1 standards or a Universal Design. Most of the design elements that are in Fair Housing Guidelines are not cost prohibitive and actually make good design sense, so for any type of residential construction this should be required.

For the Fair Housing Design Manual, please go to this HUD link:
http://www.huduser.org/Publications/pdf/fairhousing/fairintro.pdf

Here is a link for Universal Design:
http://www.design.ncsu.edu/cud/pubs_p/docs/UDinHousing.pdf


Comments

Popular posts from this blog

The Deepest Dive - Summary

It was called the inverted moon landing. The deepest work dives ever. It was the dive that would make Norway unimaginably rich. In retrospect, it was called a success. How was it possible when one died, one was injured and a third party as far as my life is preserved? http://www.nrk.no/dokumentar/xl/det-dypeste-dykket-1.12601303

Submittals and Architect Responsibility

Submittals are NOT contract documents, but are only to demonstrate the way that the contractor proposes to conform with the design concept in the contract documents. Pursuant to AIA A201 2007: 3.12.4 Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents. Their purpose is to demonstrate the way by which the Contractor proposes to conform to the information given and the design concept expressed in the Contract Documents for those portions of the Work for which the Contract Documents require submittals. Review by the Architect is subject to the limitations of Section 4.2. 7. Informational submittals upon which the Architect is not expected to take responsive action may be so identified in the Contract Documents. Submittals that are not required by the Contract Documents may be returned by the Architect without action.

It tore at every stage. I wondered if I would survive

He screamed with pain. The German doctor just stood and watched and smoked cigar, says Egil Eid. In 1972, planned and approved Arbeidstilsynet an attempt dives that could have ended fatally for him and Per Ludvigsen.